DEM-Based Watershed Delineation and Hydrological Parameter Extraction for HEC-HMS Modeling in Karangnongko Dam, Bojonegoro

Nabila Dinda Safitri (1), Novie Handajani (2)
(1) Department of Civil Engineering, Faculty of Science and Technology, Universitas Pembangunan “Veteran” East Java, Surabaya, Indonesia
(2) Department of Civil Engineering, Faculty of Science and Technology, Universitas Pembangunan “Veteran” East Java, Surabaya, Indonesia
Fulltext View | Download
How to cite (AJARCDE) :
Safitri, N. D., & Handajani, N. (2026). DEM-Based Watershed Delineation and Hydrological Parameter Extraction for HEC-HMS Modeling in Karangnongko Dam, Bojonegoro . AJARCDE (Asian Journal of Applied Research for Community Development and Empowerment), 10(2), 366–372. https://doi.org/10.29165/ajarcde.v10i2.1053

This study applied DEM-based automatic watershed delineation using QGIS to derive hydrological parameters and develop a basin model for the Karangnongko Watershed, Bojonegoro. The delineation process successfully produced watershed boundaries, stream networks, and subbasin configurations consistent with the study area's topographic characteristics. Hydrological parameters such as watershed area, stream length, basin slope, and flow path characteristics were extracted from DEM analysis and used as input to develop the HEC-HMS basin model. The final model consists of 3 subbasins, 1 reach, and 1 junction, arranged according to the drainage hierarchy obtained from the delineation results. The results show that the accuracy of watershed delineation and hydrological parameter extraction is strongly influenced by DEM quality, preprocessing steps, and stream threshold selection. Proper DEM preprocessing, particularly sink filling and flow direction correction, improves drainage continuity and produces more reliable watershed representation. In general, integrating GIS-based delineation with HEC-HMS provides an efficient approach to hydrological modeling. This method improves spatial consistency, reduces manual interpretation during basin development, and supports more reliable preparation of hydrological parameters for watershed analysis.


Contribution to Sustainable Development Goals (SDGs):
SDG 6: Clean Water and Sanitation
SDG 9: Industry, Innovation, and Infrastructure
SDG 11: Sustainable Cities and Communities
SDG 13: Climate Action
SDG 15: Life on Land

[1] Chow, V. T., Maidment, D. R., & Mays, L. W. Applied Hydrology. New York: McGraw-Hill. 1988.

[2] Tarboton, D. G. “A New Method for the Determination of Flow Directions and Upslope Areas in Grid Digital Elevation Models.” Water Resources Research, 33(2), 309–319. https://doi.org/10.1029/96WR03137. 1997.

[3] Wilson, J. P., & Gallant, J. C. Terrain Analysis: Principles and Applications. New York: Wiley. 2000.

[4] United States Army Corps of Engineers. HEC-HMS Hydrologic Modeling System User’s Manual. Hydrologic Engineering Center. 2021.

[5] Jenson, S. K. “Applications of Hydrologic Information Automatically Extracted from Digital Elevation Models.” Hydrological Processes, 5(1), 31–44. https://doi.org/10.1002/hyp.3360050104. 1991.

[6] Karmaker, S., Sheikh, S., Islam, M. S., et al. “Watershed Delineation in South Bengal Ganges Delta Region of Bangladesh Using Satellite Imagery and Digital Elevation Model.” Arabian Journal of Geosciences, 15, 997. https://doi.org/10.1007/s12517-022-10203-5. 2022.

[7] Orlandini, S., Moretti, G., Franchini, M., Aldighieri, B., & Testa, B. “Path-Based Methods for the Determination of Nondispersive Drainage Directions in Grid-Based Digital Elevation Models.” Water Resources Research, 39(6), 1144. https://doi.org/10.1029/2002WR001639. 2003.

[8] Teshome, A., Adane, M., & Taye, M. “Hydrological Modeling Using HEC-HMS Model, Case of Tikur Wuha River Basin, Rift Valley River Basin, Ethiopia.” Environmental Challenges, 15, 101017. https://doi.org/10.1016/j.envc.2024.101017. 2024.

[9] Fernandez, R., McGrath, G., & Bolster, D. “Next to or through your house?: Comparison of statistical and spatial results to understand the effects of DEM resolution on stream delineation.” Journal of Hydrology, 633, 130976. https://doi.org/10.1016/j.jhydrol.2024.130976. 2024.

[10] Arabameri, A., Saha, S., Roy, J., et al. “Optimization of Flow Accumulation Thresholds for Automatic River Network Extraction Using DEM-Based Hydrological Analysis.” Environmental Earth Sciences, 83, 115. https://doi.org/10.1007/s12665-024-11328-7. 2024.

[11] Kastridis, A., Theodosiou, G., & Fotiadis, G. “Investigation of DEM Resolution Effects on Watershed Delineation and Hydrological Parameters.” Hydrology, 11(2), 29. https://doi.org/10.3390/hydrology11020029. 2024.

[12] Niu, J., Chen, J., & Sivakumar, B. “Influence of Watershed Physical Characteristics on Hydrological Modeling Performance Using GIS-Based Parameter Extraction.” Hydrological Processes, 38(4), e15192. https://doi.org/10.1002/hyp.15192. 2024.

[13] Teshome, A., Adane, M., & Taye, M. “Hydrological Modeling Using HEC-HMS Model, Case of Tikur Wuha River Basin, Rift Valley River Basin, Ethiopia.” Environmental Challenges, 15, 101017. https://doi.org/10.1016/j.envc.2024.101017. 2024.

[14] Alqurashi, A., Abdullah, R., & Almazroui, M. “Integration of GIS-Based Watershed Delineation and HEC-HMS for Hydrological Model Development.” Water, 16(3), 487. https://doi.org/10.3390/w16030487. 2024.

Downloads

Download data is not yet available.